Streamline your operations and cut down project costs with Xsite

UPGRADE THE WAY YOU OPERATE

Lower operational costs and better productivity

Model based workflow helps you forecast, oversee and finish projects more efficiently with less resources, less waste and smaller costs.

With Xsite’s full Support for open BIM, you can use your fleet as efficiently as possible, with faster turnaround time.

Right information in the right place – in real time

Optimize workflows with data and bring your control of detail to a new level. Xsite transforms the project specifications into easily digestible visual format for all users.

The Xsite® ecosystem is based on open standards and non-proprietary formats. This enables seamsless data exchange between all parties.

The regulations and your customers’ expectations are changing. With Xsite, you can stay in the frontline! Optimize with Xsite, and your back is covered better than ever.

remarkable savings in Project flow

It is normal to come up to an situation on construction site, where planning has to be updated to suite to a new found data. It might be an essential pipeline, that can not be moved, or another underground obstacle.

The following timelines display the differences in delays and deliverytimes in a simple way.

The timelines have a common startingpoint.

”Excavator on-site detects an undocumented pipeline during cut. The operator has been adviced, that all the existing pipelines have to be preserved”
TRADITIONAL WORKFLOW
Day 1
Data gathering Operator informs site manager, who calls surveyor. Surveyor arrives from another site and surveys the pipeline
Day 3
Data sent to designer Gathered data is edited and sent to designer and the update need explained
Day 5
Design update finished and approved Design is sent to printing and is ready to be delivered to the site
Day 6
Site manager gets the revisions Paper copies arrive to site and the manager starts to distribute copies of the revision to other parties
Day 7
Surveyors redo stakes After he updates survey data to his devices. Old stakes based on outdated plans are removed
Day 8
Excavators start working According to updated plans, with new stakes and copies on paper revisions
MODEL BASED WORKFLOW
Day 1
00:02 hours
Data gathering Operator does the surveying with the machine’s bucket, using the machine control system, takes a few photos and the site manager informs the designer
00:10 hours
Data sent to designer Data is sent via a link from the site managing software, including the original design model
04:00 hours
Design update finished and approved The design is sent back to site management software, in ready-to-use format
04:01 hours
Site manager gets the revisions Machinery gets notification of updated plans and old versions are replaced
04:05 hours
Excavators start working According to updated plans, and gather as built data as they go
Total time: TRADITIONAL WORKFLOW 8 working days
Total time: MODEL BASED WORKFLOW 04:05 hours

The traditional way took days, when model-based path took just hours. The time taken by traditional method could be rushed by couple of days, but the difference would still be substantial.

Benefits of open BIM

Follow progress in real time

Know exactly how much to cut or fill. Material and transportation costs decrease as the use and transportation of extra materials are no longer needed.

Easier and faster to update plans

Know exactly how much to cut or fill. Material and transportation costs decrease as the use and transportation of extra materials are no longer needed.

Better productivity for your fleet

Know exactly how much to cut or fill. Material and transportation costs decrease as the use and transportation of extra materials are no longer needed.

No data loss or file conversions

Know exactly how much to cut or fill. Material and transportation costs decrease as the use and transportation of extra materials are no longer needed.

A headline for a customer story

Small intro text to main highlight story. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. Lorem ipsum dolor sit amet, consetetur sadipscing elitr.

HEADLINE OF THIS VIDEO

Machine control system assist the machine operator in attaining the target plane quickly and easily. When the job is carried out properly the first time, you can save time, materials, and fuel. The increased productivity gained thereby shows in improved work profitability.

xsited TO LEARN MORE? find your local dealer!